

Phase II
After completion of the main facade during the first construction phase, the open atrium of the MST.factory service center was equipped with with a wire mesh wall using EGLA-TWIN 4243. It protects the offices inside the atrium from the sun.
Whereas the mesh panels absorb most of the direct sunlight, it still offers a very much sufficient sight from the inside and maintains a high degree of natural lighting.
Page 2 shows phase 1 of this construction.
YOU ARE HERE: Applications & Products - Architectural wire mesh - Overview Meshes - EGLA-TWIN